3 Levels of Service
Available for FleetGenius and Most Other Brand Compactors
- Upon receipt, each unit is staged and given an initial inspection and evaluation to establish the full scope of work and pricing prior to beginning the refurbishment process.
- Unit is prepped and pressure washed.
- Overall Inspection of condition and structural integrity
Inspection Items:
- Understructure frame, cross members, hooks, and main rails
- Steel surfaces and welds
- Packer floors and walls
- Ram floor and sides
- Ram Guides, shoes,
- Container floor and side walls
- Access panels, covers, wiper blades
- Door latches, hinges, and seals
- Ground wheels, nose rollers, bull noses, brackets, axels, ratchets,etc.
Service Level 1
- Minor patch repairs as needed
- Power Unit – Inspection of unit including diagnostics on operating system and load test – make minor component replacements and repairs – change hydraulic oil & filters – ensure unit is in good, overall running condition
- Inspect cylinders for leaks and functionality
- Inspect ram guides and ram tracking
- Inspect hydraulic hoses / fittings and replace if necessary
- Inspect / grease wear items such as ground wheel, nose rollers, door seals, etc. and replace as necessary
- QC, test, and water test to ensure compactor is in good running condition
- Repaint, apply ANSI Safety Decals, and stage for deployment
Warranty for Service Level 1 = 30 Days
Service Level 2
- Inspect overall unit and structural integrity – includes patch & major repairs
- Inspect power unit – run diagnostics on operating system and load test – make minor component replacements and repairs – change hydraulic oil & filters – ensure unit is in good, overall running condition
- Inspect & replace with “rebuilt” cylinders (if necessary)
- Install new cylinder mounts & pins
- Install new cylinder hoses & fittings
- Inspect ram guides and ram tracking
- Inspect hydraulic hoses / fittings and replace if necessary
- Inspect / grease wear items such as ground wheel, nose rollers, door seals, etc. and replace ifnecessary
- QC, test, and water test to ensure compactor is in good running condition
- Prep Surfaces and Repaint, apply ANSI Safety Decals, and stage for deployment
Warranty for Service Level 2 = 120 Days
Service Level 3
- Inspect overall unit and structural integrity – includes patch & major repairs
- All Level 3 Refurbishments include an all new standard Pinnacle Power Unit
- Install / replace with “new” cylinders
- Install new cylinder mounts & pins
- Install new cylinder hoses & fittings
- Inspect ram guides and ram tracking
- Replace all hydraulic hoses / fittings
- Replace / grease all wear items such as ground wheels, nose rollers, door seals, etc.
- QC, test, and water test to ensure compactor is in good running condition
- Prep Surfaces and Repaint, apply ANSI Safety Decals, and stage for deployment
Warranty for Service Level 3 = 1 Year (12 months)
*Service Levels 1 and 2 include power unit testing, light refurbishment, and part replacements– if power unit is deemed cost prohibitive to refurbish, a new power unit will be recommended and priced separately